Any demolition work beyond that shown on the approved.
Demo notes for flooring.
The demolition drawings have been developed from.
General notes new construction on sheet a200 102.
Intent of demolition is to return building to basic core and shell with a level floor.
General notes for project on project information sheet g001 b.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
Arvada co 80004 6980 pierce st.
First floor demolition plan lincoln academy building corp.
If exists remove sheet applied tinting from all existing doors and windows.
6 inches shall be placed between the concrete floor slab and the base course.
Second floor plan lincoln academy building corp.
Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
Get fair costs for your specific project requirements.
Arvada co 80003 06 07 13 issue for bidding and construction a1 1 8 1 ˇ0 first floor plan sheet notes demolition plans note 1 demo existing base and upper cabinets 2 demo existing.
Demolition calculation 1 scale.
1 4 1 0 first floor demo residential demolition note.
General notes for demolition plan 101.
Existing flooring in all work areas to be removed down to the concrete deck.
Removals to include but not limited to vinyl composition tile carpet sheet flooring cermaic tile transitions adhesives mastics underlayment mortar bedding.
Unit types 6 9 10 are new the demo for those instances is on d102.
Of under floor area and an access opening through the floor 18 x 24 min.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
Labc section 1808 6 larc section r403 1 8 r506 1 4.
The cost to remove flooring starts at 1 26 2 46 per square foot but can vary significantly with site conditions and options.
For each 150 sq.
See typical tasks and time to remove flooring along with per unit costs and material requirements.
1 4 1 0 existing floor plan 2 scale.
See professionally prepared estimates for flooring removal work.
Partial demolition of a residential structure in association with a construction project is only permitted where indicated on the approved plans.
Provide under floor net ventilation opening size and locations equal to 1 sq.
Remove all interior partitions floor finishes and existing ceilings to structure except where noted to remain on the demolition plan.